Submitted on May 29th, 2008 by Erich J. Knight (not verified)
Carbon sequestered at what Price , and limited Geo storage space verses a Biomass Pyrolysis plant that cost $3M / MW to build, and all the Land to store it in. Add to this 10X N20 GHG soil emission reductions and 3X yield increases sucking even more CO2 from the air.
Every 1 ton of Biomass/Biofuel cycled sequesters 1/3 ton Biochar Carbon.
CCS Pyrolysis / Soil Verses Combustion / Geo Sequestration
Submitted on May 29th, 2008 by Erich J. Knight (not verified)Carbon sequestered at what Price , and limited Geo storage space verses a Biomass Pyrolysis plant that cost $3M / MW to build, and all the Land to store it in. Add to this 10X N20 GHG soil emission reductions and 3X yield increases sucking even more CO2 from the air.
Every 1 ton of Biomass/Biofuel cycled sequesters 1/3 ton Biochar Carbon.
What's not to love ?!